Back | Consulted on the first major road tunnel for Karak Highway.

Minconsult was appointed by the Government of Malaysia as Consultant for the Kuala
Lumpur-Karak highway, which is approximately 60 km in length. At about mid-length, the highway crosses the highlands at Genting Sempah and Minconsult in association with Sauti Engineering of Italy had designed the first and longest road tunnel in Malaysia (900km).

The tunnel is sited at an altitude of about 610m above sea level and was opened for traffic in
January-1979.

copyright © Minconsult Sdn Bhd 2012-2017
web counter