Back | Brunei LNG Sendirian Berhad Report On Rehabilitation Of Railway Line

Brunei LNG Plant has a railway track connecting Brunei On-shore Oil Refinery and the Off-shore Jetty.

Brunei LNG Authorities felt that the condition of the track was not up to the mark and felt the need for remedial measures to be undertaken for the track. MINCONSULT SDN BHD was entrusted with the task of carrying out a study on the Railway System and suggests remedial measures.

MINCONSULT SDN BHD carried out an inspection and suggested two types of remedial measures viz. short term and long term, along with budgetary cost estimates.

 