Back | Detailed Design Consultancy Services For The Proposed Kelana Jaya Line Extension Project

Client
Syarikat Prasarana Negara Berhad (SPNB)

Detail Narrative Description of Project
The proposed extension for the Kelana Jaya Line will involve construction of an elevated twin track from Lembah Subang - Kelana Business Centre - Subang Parade - Summit USJ - Taipan and ending at Kampung Utama (near Putra Heights). The route length will be approximately 16 kilometers with twelve (12) stations and two (2) proposed park and ride. The operation of the existing and the new extension LRT lines will be controlled from the existing Operation Control Centre in Lembah Subang Depot.

Detail Description of Actual Services
Engineering Consultancy:Provide the professional engineering, Civil and Structural Engineering, Mechanical and Electrical Engineering and System Works, architectural and quantity surveying services relating to all specialised and detailed designs as well as supervision of the works for the implementation of the KLJ Line Extension.

The general services, facilities design (conventional contract) and system design (design and build contract) shall comprise of planning and submission to relevant approving authorities, design of route alignments and guideways, foundations, structures, architectural designs, M & E, all related infrastructure, system designs and the preparation of tender documents.

Project Completion
2012

copyright © Minconsult Sdn Bhd 2012-2018
web counter