Back | Bandar Baru Sri Iskandar Water Supply Project

Detail Description of Actual Services
The second phase of the Bandar Baru Sri Iskandar Water Supply Scheme was planned to meet the ultimate demand of the newly developed township of Bandar Baru Sri Iskandar in Perak.

The scheme includes a 35 MLD water treatment plant located at Kampong Senin. Raw water is abstracted Sg. Perak and pumped to the treatment plant by means of low-lift submersible pumps, where it goes through the conventional treatment processes. The treated water is then pumped to a 13 ML ground reservoir located 4 km away from the treatment plant.

Construction Cost
RM 18 Million

Project Completion
2000