Back | North South Expressway

Client
Projek Lebuhraya Utara-Selatan Bhd. (PLUS)

Detail Narrative Description of Project
The New Klang Valley Expressway is a new tolled highway consisting of 38 km of dual 3 lane highway, 8 interchanges and 4 toll plazas.  The expressway is located in flat to rolling terrain fringing the built-up residential areas of Shah Alam, Petaling Jaya and Kuala Lumpur. 

The Kuala Lumpur-Tanjong Malim Expressway consists of 16km of dual 3 lane highway and 44 km of dual 2 lane highway with provision for upgrading in the future, 4 interchanges and 3 toll plazas.  This interurban highway is located in rolling terrain away from built-up areas.

Detail Description of Actual Services
Civil and structural work included:

  • Site investigation
  • Detailed engineering design
  • Bill of quantities
  • Tender documentation and evaluation of bids
  • Construction supervision and contract administration

Work Highlights
Detailed structural design of bridge, box culvert and retaining wall

  • Detailed drainage design
  • Detailed design for alignment of roads, pavement and layout of toll plaza
  • Detailed design of interchanges

Construction Cost
RM 700 Million

Project Completion
October 1996

copyright © Minconsult Sdn Bhd 2012-2018
web counter